CHENIERE ENERGY
- Capacity: ~2.75 Bcf/ d
- Distance: 21.5 miles
- Diameter: 48″ pipeline
- In service: 2018
Cheniere Corpus Christi Pipeline, L.P., an indirect wholly owned subsidiary of Cheniere, owns a 21.5-mile, 48-inch natural gas pipeline that connects the Corpus Christi Liquefaction facility (CCL) with several interstate and intrastate natural gas pipelines. The pipeline is designed to transport 2.75 Bcf/ d of feed gas required by CCL to produce LNG.